Projects / References

AbbVie Operations Singapore Pte Ltd, Singapore – Site Improvement Projects
Site Improvement Projects, (Water for Injection Generation / Storage and Distribution
System Installation; Clean Steam Generation and Distribution System Installation,
Media Prep / Buffer Prep / Buffer Hold Vessel and Associated Piping Installation). -
Responsible for 3D process & utility piping design, as well as, process skid design,
vendor and design firm coordination. Design activities on project included: 3D process
equipment and piping model development with material database, equipment platform
design, piping plan and detail development, piping fabrication isometrics, facility
equipment layout, piping material and installation specifications, design checking,
vendor submittal review, model design reviews via internet.
Lonza Biologics, Portsmouth, NH – NG3M Project
Mid-Scale Cell Culture Facility. - Responsible for 3D process piping design, process
and process utility module design and coordination. Supervised Designers. Design
activities on project included: BIM / MEP coordination, 3D process piping model
development with material database, facility equipment layout, piping material and
installation specifications, design checking, vendor submittal review, process
equipment / module vendor coordination and construction support.
Micron Memory, Hiroshima Japan – Fab 15 Project (through M+W Group)
Fab 15 Project. - Responsible for 3D space coordination and equipment/tool installation
plans. Design activities on project included: 3D equipment/tool and piping model
development, facility equipment/tool layout, design checking, vendor submittal review,
3D model design reviews and construction installation support.
AbbVie Operations Singapore Pte Ltd, Singapore – Site Improvement Projects
Site Improvement Projects, (Water for Injection Distribution Modifications, CIP Skid
Installation, Caustic Dilution Skid Installation, Final Product Vessel Installation). -
Responsible for 3D process & utility piping design, as well as, skid vendor coordination,
equipment installation plans. Design activities on project included: 3D process
equipment and piping model development with material database, piping plan and
detail development, piping fabrication isometrics, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review,
model design reviews via internet..
Lonza Biologics Tuas Pte Ltd, Singapore – Water for Injection Distribution Expansion
Water for Injection Distribution Expansion. - Responsible for 3D equipment and process
piping design for WFI loop (700 meters long with 35 use points). Design activities on
project included: 3D process equipment and piping model development with material
database, piping plan and detail development, piping fabrication isometrics, facility
equipment layout, piping material and installation specifications, design checking,
vendor submittal review, model design reviews via internet.
Kenyon Pte Ltd, Singapore – Novartis DSP and Xolair Projects
Downstream Purification Module & COP/SOP Station. - Responsible for 3D process
module design and coordination. Supervised Designers. Design activities on project
included: P&ID development support, facility equipment layouts, 3D model development
of skid framework, equipment, piping, control panels, conduit/cable tray, instruments;
frame fabrication drawings, piping fabrication isometrics, piping material and
installation specifications, design checking, vendor submittal review, vendor fabrication
support, and construction installation support.
Novartis Singapore Pharmaceuticals Manufacturing Pte Ltd, Singapore – SGBO 2 Project
Large Scale Cell Culture Facility. - Responsible for 3D process piping design, process
and process utility module design and coordination. Supervised Designers. Design
activities on project included: BIM / MEP coordination, 3D process piping model
development with material database, piping plan and detail development, piping
fabrication isometrics, facility equipment layout, piping material and installation
specifications, design checking, vendor submittal review, process equipment / module
vendor coordination and construction support.
Roche Diagnostics (Suzhou) Ltd, Suzhou, China – IVD Greenfield Project
Purified Water Compounding Station and COP/SOP Station Design. - Responsible for
design of (11) fixed and mobile compounding stations and (3) COP/SOP stations.
Design activities on project included: P&ID development support, facility equipment
layouts, 3D model development of skid framework, equipment, piping, control panels,
conduit/cable tray, instruments; frame fabrication drawings, piping fabrication
isometrics, piping material and installation specifications, design checking, vendor
submittal review, and vendor fabrication support.
Novartis Singapore Pharmaceuticals Manufacturing Pte Ltd, Singapore – BioPharmOps
Project (through Jacobs Engineering)
Large Scale Cell Culture Facility, Grass Roots. - Responsible for 3D process piping
design, upstream manufacturing process module design and coordination. Supervised
(10) Designers. Design activities on project included: BIM / MEP coordination, 3D
process piping model development with material database, piping plan and detail
development, piping fabrication isometrics, facility equipment layout, piping material
and installation specifications, design checking, vendor submittal review, process
equipment / module vendor coordination and construction support.
Roche Singapore Technical Operations Pte Ltd, Singapore – DI/WFI Water Upgrade Project
Deionized Water/Water For Injection Generation and distribution Expansion. -
Responsible for new 3D process piping design and existing piping design
modifications. Design activities on project included: BIM / MEP coordination, 3D process
piping model development with material database, piping plan and detail development,
piping fabrication isometrics, piping material and installation specifications, design
checking, vendor submittal review, and construction support.
Lonza Biologics Tuas Pte Ltd, Singapore – Media Prep Suite Addition
Media Prep Suite Addition. - Responsible for 3D suite design of equipment, platform,
vessels, process and utility piping design. Design activities on project included: BIM /
MEP coordination, 3D process equipment and piping model development with material
database, piping plan and detail development, piping fabrication isometrics, facility
equipment layout, piping material and installation specifications, design checking,
vendor submittal review, model design reviews via internet.
Lonza Biologics, Portsmouth, NH – Purification Suite Build-out (through Parsons)
Purification Suite Build-out, 2 story expansion. - Responsible for 3D model
management of entire project, which included process skid and equipment vendors.
3D model management activities included: BIM / MEP coordination, development of
project modeling guidelines, discipline space coordination and clash resolutions, 3D
model reviews via internet. Design activities on project included: 3D process equipment
and piping model development with material database, piping plan and detail
development, piping fabrication isometrics, process equipment vendor coordination,
facility equipment layout, piping material and installation specifications, design
checking, vendor submittal review, and construction support.
Baxter Bioscience, Hayward, CA – Lab Relocation Project
Lab Relocation Project. - Responsible for lab demolition drawing package, lab general
arrangement plan, lab utility and piping design, and installation drawing package.
Roche Singapore Technical Operations Pte Ltd, Singapore – Clean Steam Distribution
Expansion (through Lifetek Solutions)
Clean Steam Distribution Expansion. - Responsible for 3D process piping design
modifications. Design activities on project included: BIM / MEP coordination, 3D process
piping model development with material database, piping plan and detail development,
piping fabrication isometrics, piping material and installation specifications, design
checking, vendor submittal review, and construction support.
Lonza Biologics Tuas Pte Ltd, Singapore – Water for Injection Storage and Distribution
Expansion (through Lifetek Solutions)
Water for Injection Storage and Distribution Expansion. - Responsible for 3D skid
design of process piping design. Design activities on project included: BIM / MEP
coordination, 3D process equipment and piping model development with material
database, piping plan and detail development, piping fabrication isometrics, facility
equipment layout, piping material and installation specifications, design checking,
vendor submittal review, model design reviews via internet.
Lonza Biologics Tuas Pte Ltd, Singapore – Media Prep Tri-Blender Installation and Process
Piping Modifications
Media Prep Tri-Blender Installation and Process Piping Modifications. - Responsible for
3D design of process piping modifications. Design activities on project included: 3D
process equipment and piping model development with material database, piping plan
and detail development, piping fabrication isometrics, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review,
model design reviews via internet.
Novartis, Emeryville, CA – Laboratory Renovation (through Ipurity)
Laboratory Renovation Project (Fully 3D modeled) - Responsible for BIM / MEP
coordination, 3D process/mechanical piping design, including existing site utility survey
information, piping plans and details.
Lonza Biologics Tuas Pte Ltd, Singapore – WFI Storage and Distribution Loop System Addition
(through Lifetek Solutions)
WFI storage vessel, heat exchangers, distribution pumps and distribution loop addition
for new building addition. - Responsible for BIM / MEP coordination, 3D design of
equipment skids and piping design. Design activities on project included: 3D process
equipment and piping model development with material database, piping plan and
detail development, piping fabrication isometrics, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review,
model design reviews via internet.
Bayer Healthcare, Berkeley, CA – Portable Vessel Blast Thaw Station (through Ipurity)
Portable Vessel Blast Thaw Station - Responsible for 3D process/mechanical piping
design, including existing site survey information, process/utility P&ID development,
vessel configuration, space coordination, piping plans and details.
Novartis, Holly Springs, NC – Technology Development Pilot Plant (through Lifetek Solutions)
New Pilot Plant Facility Project (Fully 3D modeled) - Responsible for 3D
process/mechanical piping design, including existing site utility survey information,
process/utility P&ID development, BIM / MEP coordination, piping plans and details.
Allergan, Waco, TX – Process/Compounding Skid (through DCI/Lifetek Solutions)
Process/Compounding Skid w/ (3) process vessels, frame and supporting
process/utility piping and accessories. - Responsible for 3D skid design. Design
activities on project included: 3D process equipment, frame and piping model
development, skid assembly plan and detail development, piping fabrication isometrics,
piping material and installation specifications, design checking, vendor submittal
review, and skid fabrication support.
Roche Singapore Technical Operations Pte Ltd, Singapore – WFI Loop & Storage
Modifications
Piping and Control Modifications to WFI Return Loop and Storage Systems. -
Responsible for 3D process piping design modifications. Design activities on project
included: BIM / MEP coordination, 3D process equipment and piping model
development with material database, piping plan and detail development, piping
fabrication isometrics, facility equipment layout, piping material and installation
specifications, design checking, vendor submittal review, and construction support.
Roche Singapore Technical Operations Pte Ltd, Singapore – Waste Water System Upgrade
Waste Water System Modifications. - Responsible for 3D model management,
equipment arrangements and piping design. 3D model management activities
included: discipline space coordination and clash resolutions, 3D model reviews via
Webex. Design activities on project included: 3D equipment and piping model
development with material database, piping plan and detail development, equipment
vendor coordination, facility equipment layout, piping material and installation
specifications, design checking, vendor submittal review, and construction support.
Lonza BioSciences Singapore Pte Ltd, Singapore – Water Pre-Treatment Upgrade
Piping modifications required for addition of (2) UV Sterilization Units. - Responsible for
3D piping design modifications. Design activities on project included: 3D process
equipment and piping model development with material database, piping plan and
detail development, piping fabrication isometrics, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review, and
construction support.
Lonza BioSciences Singapore Pte Ltd, Singapore – Multiple Customer Filtration Modifications
Piping modifications required for additional product filtration installations. - Responsible
for 3D process piping design modifications. Design activities on project included: 3D
process equipment and piping model development with material database, piping plan
and detail development, piping fabrication isometrics, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review, and
construction support.
Lonza BioSciences Singapore Pte Ltd, Singapore – (2) 200L Bioreactor Installation
Piping modifications required for installation of (2) 200L Bioreactors. - Responsible for
3D process and utility piping design modifications. Design activities on project included:
3D process equipment and piping model development with material database, piping
plan and detail development, piping fabrication isometrics, facility equipment layout,
piping material and installation specifications, design checking, vendor submittal
review, and construction support.
Roche Singapore Technical Operations Pte Ltd, Singapore – Purified Water System
Design and Installation of new Purified Water System including generation, storage and
distribution. - Responsible for 3D model management, process equipment design and
process piping. 3D model management activities included: BIM / MEP coordination,
development of project modeling guidelines, discipline space coordination and clash
resolutions, 3D model reviews via Webex. Design activities on project included: 3D
process equipment and piping model development with material database, piping plan
and detail development, piping fabrication isometrics, process module vendor
coordination, facility equipment layout, piping material and installation specifications,
design checking, vendor submittal review, and construction support.
Baxter Bioscience, Hayward, CA – Plant Steam Boiler Replacement
Plant Steam Boiler Replacement along with Steam Distribution and Condensate Return
Piping. - Responsible for demolition drawing package, boiler room general
arrangement plan, 3D steam and condensate piping design, and installation drawing
package. Also assisted with vendor submittal reviews and field construction support.
Dendreon, Seal Beach, CA – Immunotherapy Manufacturing Facility (through Lifetek Solutions)
Immunotherapy Manufacturing Facility Project (Fully 3D modeled) - Responsible for 3D
process/mechanical piping design, including piping plans and details. Assisted with
field construction support.
Dendreon, Union City, GA – Immunotherapy Manufacturing Facility (through Lifetek Solutions)
Immunotherapy Manufacturing Facility Project (Fully 3D modeled) - Responsible for 3D
process/mechanical piping design, including piping plans and details.
Lonza Biologics Tuas Pte Ltd, Singapore – Large Scale Cell Culture Facility (through Parsons)
Large Scale Cell Culture Project LBXS-2, 280,000 Sq. Ft. Grass Roots Facility (Fully 3D
modeled). - Responsible for 3D model management of entire project, which included 2
major Engineering Firms and 5 major Process Module/Super Skid vendors located in
various global locations. 3D model management activities included: BIM / MEP
coordination, development of project modeling guidelines, discipline space
coordination and clash resolutions, 3D model reviews via Webex. Design activities on
project included: 3D process equipment and piping model development with material
database, piping plan and detail development, piping fabrication isometrics (1200+
isos created), process module vendor coordination, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review, and
construction support.
BioMarin Pharmaceutical Inc., Novato, CA – Heat Treatment Skid (through Lifetek
Solutions/DCI)
Heat Treatment Skid - 650L process vessel, heat exchanger, pump w/process and utility
piping. Used for heating/cooling a process intermediate stream to remove background
impurities. - Responsible for 3D skid design, including client model reviews via Webex,
assembly drawing, frame details, and piping fabrication isometric drawings. Assisted
with vendor submittal reviews, and shop fabrication support.
Roche (Lonza Biologics Singapore Pte Ltd), Singapore – Large Scale Cell Culture Facility
(through Parsons)
Large Scale Cell Culture Project LBXS-1, 280,000 Sq. Ft. Grass Roots Facility (Fully 3D
modeled). - Responsible for 3D model management of entire project, which included 2
major Engineering Firms and 5 major Process Module/Super Skid vendors located in
various global locations. 3D model management activities included: BIM / MEP
coordination, development of project modeling guidelines, discipline space
coordination and clash resolutions, 3D model reviews via Webex. Design activities on
project included: 3D process equipment and piping model development with material
database, piping plan and detail development, piping fabrication isometrics (1100+
isos created), process module vendor coordination, facility equipment layout, piping
material and installation specifications, design checking, vendor submittal review, and
construction support. Less than 2% high purity piping re-work for piping designed by
Axis Point Design.
Baxter Bioscience, Hayward, CA – 1600L & 400L Bioreactor Installation
Modified existing Cell Culture Suite to install new 1600L & 400L Bioreactors. -
Responsible for process/utility piping distribution modifications and design. Also
responsible for contractor coordination, on behalf of Baxter, as well as updating utility
system P&ID and piping drawings, HVAC air flow diagrams, HVAC pressurization and
classification drawings maintained as Baxter Master Files.
Baxter Bioscience, Hayward, CA – CoSeal/FloSeal Relocation
Relocated existing CoSeal/FloSeal manufacturing from Fremont, CA facility to Hayward,
CA facility. - Responsible for process/utility system as-builts and HVAC system as-
builts, updating process/utility system P&ID and piping drawings, HVAC air flow
diagrams, HVAC pressurization and classification drawings.
Baxter Bioscience, Hayward, CA – Purification Suite Modifications
Expanded existing Purification Suite into existing Cell Inoculum & Gowning Rooms. -
Responsible for utility system modifications and HVAC modifications, updating utility
system P&ID and piping drawings, HVAC air flow diagrams, HVAC pressurization and
classification drawings.
Dey L.P., Napa, CA – Clinical Pilot Plant, Detailed Design (through IPS)
Detailed design for 4,000 sq. ft. pilot plant for clinical and product launch quantities of
products using Form/Fill Seal technology. - Responsible for equipment layouts, plant
and process utility distribution p&ids, plant and process utility distribution piping,
process waste and plumbing systems, piping system specifications.
Amgen, Bothell, WA – Wastewater Treatment System Replacement (through IPS)
Replacement of 8,500 gallon neutralization tank, bulk acid and caustic storage tanks,
metering pumps, and associated piping. - Responsible for project management,
equipment specification, equipment arrangements, piping design and specification,
vendor submittal review, construction management and commissioning.
Orthovita, Malvern, PA – Costasis/Vitagel Relocation (through IPS)
Relocation of purchased product process from Palo Alto, CA to Malvern, PA. -
Responsible for site utility survey, P&ID development, equipment specification, fixture
detail design, facility layout, process and utility piping design, vendor submittal review,
construction support.
Baxter Bioscience, Fremont, CA – Purified Water System As-Builts
Required as-builts of Purified Water System P&ID and piping drawings. - Responsible
for system walk down verification, updating system P&ID and piping drawings.
Baxter Bioscience, Hayward, CA – Process and Utility System As-Builts
Required as-builts of Process and Utility System P&IDs, facility and piping drawings. -
Responsible for system walk down verification, updating system P&IDs, updating facility
drawings, updating piping drawings, CAD standard development, document control
protocol.
Amgen, Bothell, WA – HVAC System As-Builts (through IPS)
Required as-builts of cell culture facility HVAC system. - Responsible for system walk
down verification, updating system P&IDs, updating facility HVAC drawings.
Lonza Biologics, Portsmouth, NH – Large Scale Build-Out Project (through Parsons)
Large Scale Build-Out Project 280,000 Sq. Ft. Cell Culture Facility Expansion. -
Responsible for piping design activities of intelligent P&ID development, 3D equipment
and piping model development with material database for process modules, piping
plan and detail development, piping fabrication isometrics, process module vendor
coordination, facility equipment layout, plumbing plan development, piping material and
installation specifications, design checking, vendor submittal review, and construction
support.
References
We would be happy to supply references which are relevant to your project needs.
Please contact us for information.